Elyra 3x3
The Elyra 3m x 3m corner garden shed, featuring 28mm walls and a spacious 7.1m² internal area, is an excellent solution for those seeking an efficient and functional garden building. Ideal as a compact home office, hobby room, or cozy garden retreat, it fits neatly into any corner of your outdoor space. Its sturdy construction and simple, elegant design offer both practicality and style, enhancing any garden setting while providing a peaceful and private area for work, relaxation, or storage.
Submit request

Walls thickness (mm) | 28 |
---|---|
Width (m) | 3 |
Depth (m) | 3 |
Total building area (m²) | 9 |
Internal (living) area (m²) | 7.1 |
Roof area (m²) | 11.2 |
Roof overhang (m) | 0.25 |
Floor board | 19 mm |
Roof type | Hip roof |
Total height (m) | 2.09 |
Side wall height (m) | 2.093 |
Quantity of doors | 1 double 50% safety (toughened) glass |
Door measures (m) | 1,85 x 1,4 |
Quantity of windows | 2 single |
Window measures (m) | 700x920 mm |
Window door glazing | Single glass safety (toughened) glass |
Shutters | No |
Number of zones | 1 |
Reverse montage | No |


Order Placement
To place an order, a 20-30% advance payment is required, with the remaining balance to be paid before order leaves the warehouse. Payment accepted by Bank Transfer. Once order is received, the cabin type and order details are forwarded to the factory.


Production
Typically production time is 5-6 weeks, if it is not in stock. For custom projects additional week is required. Timing may vary depending on production volume and seasonal demand.


Leaves Our Factory
The production of your cabin is now complete. Goods are flat-packed in weather-resistant packaging. The remaining balance required and order will be ready to ship.


Delivery
Delivery and unloading of the goods by forklift are free of charge and roughly takes 1 week after leaving the factory depending on location. After goods are shipped, an estimated delivery date will be given, with the exact date confirmed by the logistics provider.


Site Preparation:
Preparation of an area for receiving ordered cabin. The assembly area must be cleared of vegetation and any obstructions. The foundation is required before assembling the cabin.


Assembling:
Cabin assembly can be done by our partners who can also provide additional services (foundation, utility installation and etc.). These are arranged independently, with payment made directly to the partner on site.